chore(deps): update dependency filiph/linkcheck to v2.0.23 #78

Merged
xoxys merged 1 commits from renovate/filiph-linkcheck-2.x into main 2022-05-18 17:49:32 +02:00
Member

This PR contains the following updates:

Package Update Change
filiph/linkcheck patch 2.0.22 -> 2.0.23

Release Notes

filiph/linkcheck

v2.0.23

Compare Source

  • Fix another issue with building artifacts through grindr/cli_pkg

Configuration

📅 Schedule: At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, click this checkbox.

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | [filiph/linkcheck](https://github.com/filiph/linkcheck) | patch | `2.0.22` -> `2.0.23` | --- ### Release Notes <details> <summary>filiph/linkcheck</summary> ### [`v2.0.23`](https://github.com/filiph/linkcheck/blob/HEAD/CHANGELOG.md#&#8203;2023) [Compare Source](https://github.com/filiph/linkcheck/compare/2.0.22...2.0.23) - Fix another issue with building artifacts through `grindr`/`cli_pkg` </details> --- ### Configuration 📅 **Schedule**: At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, click this checkbox. --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate).
renovator added 1 commit 2022-05-18 17:47:55 +02:00
xoxys merged commit db4edb3554 into main 2022-05-18 17:49:32 +02:00
xoxys deleted branch renovate/filiph-linkcheck-2.x 2022-05-18 17:49:32 +02:00
This repo is archived. You cannot comment on pull requests.
No reviewers
No Label
No Milestone
No Assignees
1 Participants
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: container/link-validator#78
No description provided.