chore(docker): update docker.io/alpine:3.18 docker digest to 69e0a8b #89

Merged
renovator merged 1 commits from renovate/docker-digests into main 2023-12-01 00:06:29 +00:00
Member

This PR contains the following updates:

Package Type Update Change
docker.io/alpine final digest eece025 -> 69e0a8b

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | docker.io/alpine | final | digest | `eece025` -> `69e0a8b` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy43NC4zIiwidXBkYXRlZEluVmVyIjoiMzcuNzQuMyIsInRhcmdldEJyYW5jaCI6Im1haW4ifQ==-->
renovator added 1 commit 2023-11-30 23:35:24 +00:00
chore(docker): update docker.io/alpine:3.18 docker digest to 69e0a8b
All checks were successful
ci/woodpecker/pr/build-package Pipeline was successful
ci/woodpecker/pr/build-container Pipeline was successful
ci/woodpecker/pr/docs Pipeline was successful
ci/woodpecker/push/build-package Pipeline was successful
ci/woodpecker/push/build-container Pipeline was successful
ci/woodpecker/push/docs Pipeline was successful
ci/woodpecker/push/notify Pipeline was successful
825b2ccd4c
renovator merged commit 825b2ccd4c into main 2023-12-01 00:06:29 +00:00
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: container/kube-tools#89
No description provided.